Kamchay Hydropower Project – May 2012

This image shows the extent of the reservoir of the recently completed Kamchay hydropower project. The image is from the dry season 2012 (May) so the reservoir is not yet at full capacity. Expected maximum water level is 175m, somewhere between the 160 and 180m contours shown in this map.Note that there are some inaccuracies in the contour data due to the limitations of the data (from 1:100,000 scale topographic maps).

Kamchay Hydropower Project

Read More


Leave a Reply




Launch of eBee X fixed-wing drone

Tweet Launched with the promise that “it’s not about the drone,” but instead about overcoming business challenges, the eBee X, part of the Parrot Business Solutions portfolio, is designed to boost the quality, efficiency and safety of an operator’s geospatial data collection. It offers a camera to suit every job, the accuracy and coverage capabilities to meet more »

Read More
View the Blog »

ArcGIS Server Basic Configurations

In case you've found ArcGIS Server configuration options confusing, here is a diagram of some basic configurations for an entry ...

Pan-sharpen Landsat 8 with ArcGIS 10

These instructions show you how to simply pan-sharpen Landsat 8 imagery using ArcGIS 10. The imagery is available for free ...